Photovoltaic Phase I (30MW no storage) Project
30MW Phase I started in 2021 and was completed and commissioned in 2023. The plant is divided into 8 arrays and each array has an inverter transformer station that gives output of 33kV. 33kV is transformed to 132kV and connected to LEC grid. On average, the monthly plant production is approximately 5MWh that is injected into LEC network.